Field PVT | Training and the bigger picture
664
post-template-default,single,single-post,postid-664,single-format-standard,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-child-theme-ver-1.0.0,qode-theme-ver-12.0.1,qode-theme-bridge,wpb-js-composer js-comp-ver-5.4.2,vc_responsive
 

Training and the bigger picture

Training and the bigger picture

 Their clients have matured oilfields in Basra Iraq and it was imperative to know the gas-oil-water ratio’s.

The local service company acquired a Leutert very high pressures Bottomhole and Surface sampling unit and Fieldpvt was given the task, train ‘them’.

Sometimes it is scary that you travel around the world and face people with whom you have worked

before standing again together with best part ‘no pretensions’ just setting standards with free thinking.

The service company ensured all its wire and slick line engineers, operators and technicians were available to make a PVT team doing Bottomhole and Surface sampling, transfer samples, In-situ Bubble & Dew Points, Zero-Flash, maintenance, risk-analyses, setting up field laboratory and marketing.

Read more…..